With the increase of distribution network renovation and new energy grid connection projects, the use of 0.1Hz very-low frequency high-voltage generators is also expanding. Recently, there have been multiple technological renovation projects involving the selection, configuration, and use of 0.1Hz very-low frequency high-voltage generators. The following is a summary of some experience gained during the project implementation process.

 

VLF Hipot Tester


1, Equipment configuration in distribution network renovation project
The 2025 distribution network renovation project in a certain region involves equipment updates for 12 35kV substations, among which the 0.1Hz very-low frequency high voltage generator is the main item in the procurement list of test equipment.
1. Configuration plan: Based on the equipment types and voltage levels covered by the project, three different specifications of 0.1Hz very-low frequency high voltage generators have been selected to meet all testing requirements.
2. Procurement cycle: The entire procurement process, from the preparation of technical specifications to the acceptance of equipment upon arrival, takes about 45 days.


2, Testing requirements for new energy power plants
The grid connection detection of photovoltaic power plants and wind farms has different requirements for 0.1Hz very-low frequency high-voltage generators, and the equipment configuration scheme of traditional power detection needs to be adjusted accordingly.
1. Photovoltaic power station: Insulation testing of inverters, box transformers, and combiner boxes is a necessary project before grid connection, requiring a 0.1Hz very-low frequency high-voltage generator with measurement capabilities suitable for DC systems.
2. Wind farm: The detection environment conditions for wind turbine tower foundations and box transformers are poor. It is recommended to choose a 0.1Hz very-low frequency high voltage generator model with a higher protection level.


3, Feedback on the use of 0.1Hz very-low frequency high-voltage generator in different projects
We have collected actual usage feedback from several units, and the following issues have repeatedly occurred in multiple projects, which are worth paying attention to in subsequent procurement and usage.
1. Low temperature start-up issue: When the winter temperature in northern regions drops to minus 15 ℃, the LCD screen response of some 0.1Hz very-low frequency high-voltage generators slows down. It is recommended to choose a wide temperature screen model.
2. Outdoor power supply: Some outdoor construction sites do not have mains power, and the battery life of the 0.1Hz very-low frequency high-voltage generator becomes a limiting factor, requiring backup generators or high-capacity mobile power sources.


4, Collaborative use scheme with microcomputer relay tester
In the comprehensive maintenance project, the 0.1Hz very-low frequency high-voltage generator needs to work in conjunction with a microcomputer relay tester. Reasonable equipment scheduling and personnel arrangement can effectively shorten the maintenance period.
1. Equipment scheduling: When multiple detection tasks are parallel, it is recommended to group them according to voltage level and equipment type, and each group should be equipped with one 0.1Hz very-low frequency high voltage generator and one microcomputer relay tester.
2. Data integration: The testing data of each group should be summarized on the same day on a unified platform for the project technical leader to evaluate the overall progress and quality.


5, Subsequent maintenance and training arrangements
After the new equipment is in place, training and daily maintenance are equally important. A sound training system can reduce the risk of human error and extend the service life of equipment.
1. Operation training: The manufacturer's technical personnel should attend the training for 1 to 2 days, covering the basic operation, safety precautions, and simple troubleshooting of the 0.1Hz very-low frequency high-voltage generator.
2. Ledger management: Establish an equipment ledger for the 0.1Hz very-low frequency high-voltage generator, recording equipment numbers, purchase dates, calibration records, and maintenance history.


FAQ
Q1: Can the same 0.1Hz very-low frequency high-voltage generator be used for new energy grid connection testing and traditional power testing?
A1: It is necessary to confirm whether the AC/DC measurement range of the equipment covers the parameter requirements of the new energy system, and some scenarios may require additional configuration of adapters.
Q2: What approval procedures are required for the procurement of 0.1Hz very-low frequency high-voltage generators in technical renovation projects?
A2: Generally, the technical department needs to propose requirements, the biotechnology department reviews technical parameters, the material department organizes procurement, and major projects also require approval from company leaders.
Q3: Who should I contact if there are still any issues after the equipment training?
A3: First, consult the operation manual and common problem document. If you cannot solve the problem, you can contact the manufacturer's technical support hotline. Wuhan UHV provides lifelong technical services.