When purchasing any type of testing instrument, it is necessary to understand the correct installation method and how to achieve better performance during the installation process. Let's take a look at the details that cannot be ignored when installing a series resonance (also known as a cable withstand voltage test device)?

 

19


Firstly, it is necessary to ensure the integrity of the series resonance purchased, which means checking whether the outer packaging is damaged and whether the spare parts inside are complete. If it is incomplete, during the entire installation process, it will be found that either one part is missing or another part is missing. Not to mention how the series resonance purchased by oneself is, it will waste a lot of time during the entire installation process. Not to mention being able to quickly detect the problem with the equipment and find a good way to solve it and restore normal production of the factory, without affecting the factory's production efficiency. Everyone must check themselves in advance when installing the series resonance, whether the outer packaging of the series resonance is damaged, and whether the spare parts are complete? If there are any problems, contacting the manufacturer in a timely manner can provide a good solution.

 

Secondly, safety and grounding
Main grounding grid connection: Copper braided wire or dedicated grounding cable with a sufficiently large cross-sectional area (usually not less than 50mm ², depending on equipment requirements) must be used. The grounding wire should be as short and straight as possible to reduce inductance. Copper bolts and nuts must be used for connection points to ensure that the contact surface is polished and polished, coated with conductive paste, and firmly tightened to prevent excessive contact resistance from causing discharge or heating.
Multi point grounding and equipotential: The grounding terminals of all system components (excitation transformers, reactors, voltage dividers, control boxes) must be independently and reliably connected to the main grounding grid. It is prohibited to simply connect the grounding wires of the equipment in series. A star radiating connection must be used to prevent ground potential difference. The grounding terminal of the test samples (such as cables, GIS, transformers) must also be reliably connected to the main grounding grid.
Discharge rod and protective grounding: Before connecting and disassembling high-voltage leads, the test sample and all high-voltage components must be fully discharged using a discharge rod with an insulated handle. After discharge, a portable protective grounding wire (short circuit) should be immediately used to short-circuit the high voltage end to the ground grid to ensure the safety of the operator.

 

Thirdly, after installing the series resonance, it is also necessary to debug its performance, understand whether its data matches the data of your own device, and whether the circuit connection is compact and there are any problems. These details are also things that everyone needs to consider during installation in order to maximize its value and feel its convenience throughout the entire testing process.

 

So from what has been said above, we can clearly understand the details of installing series resonance that cannot be ignored, in order to ensure smoother detection of equipment problems and obtain very accurate data.