The zinc oxide lightning arrester tester under UHV power can help many power workers conduct various power tests more conveniently.

1. PT secondary method detection:
If it is live on site, the voltage signal should be taken from the PT secondary side and wired correctly. Before starting up, connect the instrument ground wire to the on-site ground wire. The red test line is the voltage line, and the black test line is the current line. The reference voltage input signal is taken from the secondary side of the PT box. If the tested lightning arrester is in phase A, connect the "reference voltage input" terminal of the instrument to phase A, connect the red clip to terminal A, connect the black clip to the neutral wire (ground), and so on; The leakage current input is taken from both ends of the lightning arrester counter, and the extracted signal is connected to the "leakage current input" end. The red clip is connected to the upper end of the counter, and the black clip is grounded.
2. Online current method detection:
The wiring of the online current method only requires the connection of the current signal, which is basically the same as the wiring of the PT secondary method, except that there is no need to connect the "reference voltage input" signal, saving the trouble of wiring and opening the PT box.
3. Laboratory offline testing (power-off testing):
If conducting offline testing in the laboratory, the wiring is shown in Figure 3. Before starting up, first connect the grounding terminal of the instrument to the laboratory ground wire. The "reference voltage input" of the instrument is connected to the output terminal of the transformer control box through a voltage testing line; Connect the red clip for "current input" and the black clip for "leakage current input" to the high-voltage terminal (ground).