video
Transformer Capacity Load No Load Tester

Transformer Capacity Load No Load Tester

Transformer Capacity Load No-load Tester can automatically check whether the wiring is correct and display the vector diagram of the three-phase current and voltage when testing the three-phase transformer. At the same time, necessary correction (such as waveform correction, temperature correction, unrated voltage correction, calibration, unrated current correction) is introduced to make the test results more accurate.

Product Introduction

Product Introduction

 

Transformer Capacity Load No Load Tester is specially used for measuring the capacity of distribution power transformer, measuring the no-load and short-circuit loss of transformer, and has the function of harmonic analysis, which is convenient for analyzing the quality of on-site power network. Transformer Capacity Load No Load Tester can automatically check whether the wiring is correct and display the vector diagram of the three-phase current and voltage when testing the three-phase transformer. At the same time, necessary correction (such as waveform correction, temperature correction, unrated voltage correction, calibration, unrated current correction) is introduced to make the test results more accurate.

 

Technical Parameters

 

Capacity measuring range

30kVA~31500kVA

Current measuring range

0 -100A auto-switch the measurement range

Current measurement accuracy

±(0.2%+3digits)

Voltage measurement range

Line Voltage 0-750V; phase voltage 0-450V, auto-switch the measurement range

Voltage measurement accuracy

± (0.2%+3digits)

Insulation resistance

>100MΩ

Leakage current

<3.5mA

Dielectric strength

the power connection on the chassis can withstand: 1500V External transformer can broaden the scope of measurement instruments

Frequency Range

40~65Hz, accuracy class 0.2;

Power Input

AC220V±10%

 

product-800-533
product-1119-746
product-800-533

 

Product Features Of Transformer Capacity Load No Load Tester

 

  • Measure the no-load current and no-load loss of the transformer; Short circuit voltage, short circuit (load) loss, capacity.
  • Experimental method: Three tables.
  • Transformer Capacity Load No-load Tester can automatically check whether the wires are connected correctly and display vector diagrams of three-phase current and voltage when testing three-phase transformers.
  • A single machine can perform load tests on substation transformers below 1600KVA; It is possible to perform load testing on substation transformers with 1/3 of the rated current below 2500KVA (if the rated current is below 1/3 of the rated current, Transformer Capacity Load No-load Tester can be converted into load loss parameters)
  • All relevant test results will be automatically corrected. Transformer Capacity Load No-load Tester can automatically perform non rated current corrections such as waveform correction, temperature correction, non rated voltage correction, and calibration, making the test results more accurate.
  • 6.320x240 LCD display, user-friendly human-machine interface, brightness control, suitable for all seasons.
  • Equipped with an electronic clock that automatically records data and time, which is beneficial for saving and managing test results.
  • Panel printers can print test results on site.
  • Data (sample settings, test results, measurement time) can be saved and viewed in the event of a power outage. It can store 500 sets of test results and can be connected to a computer for data transmission.
  • Allow external connection of CT and PT for extended measurement, which can test any parameter of the sample.

 

Product Advantages

 

The Transformer Capacity Load No Load Tester is an indispensable multifunctional and intelligent on-site testing equipment in the power system. It accurately measures core characteristic parameters such as no-load loss, load loss, and impedance voltage of transformers, which can not only effectively determine the actual capacity of transformers (for verification and anti electricity theft), but also serve as an important tool for evaluating transformer energy efficiency, inspecting manufacturing quality, diagnosing internal faults, and conducting preventive maintenance. Its application runs through the entire lifecycle of transformer manufacturing, installation, operation, maintenance, and retirement, and is of great significance for ensuring the safe and economic operation of the power grid, promoting energy conservation and emission reduction

 

Application of Transformer Capacity Load No load Tester

 

1.The electricity inspection, measurement, and testing department of the power company (power supply bureau).
2.The power department and equipment management department of large industrial and mining enterprises.
3.The quality inspection department of the transformer manufacturing plant.
4.The testing team of the power installation engineering company.
5.Third party testing and certification organizations.
6.Research institutes.

 

Common Troubleshooting

 

1.Boot no display: first off, open the socket on the back panel AC 220V fuse box, check the fuse box, you can replace insurance.
2.The screen suddenly black screen: press the reset button, to start measurement.
3.Measurement and computation results are not correct: Check the external wiring, whether by manual operation, whether bad or take the wrong line; relevant parameter is incorrect.
4.Measuring voltage and current display to zero the normal, check whether the current file fuse blown

 

Why choose us?

 

When you choose us, you choose a partner with extensive export experience spanning nearly 100 countries across Southeast Asia, the Middle East, the Americas, and beyond. We understand the challenges of international logistics, documentation, and compliance, and we handle them smoothly so you can focus on your projects. Our factory and office environment are designed for efficiency and quality-clean, well-organized, and equipped with advanced manufacturing and testing systems. Walk through our facility (virtually or in person), and you will see the discipline and care that goes into every tester we build. We back our hardware with fast, responsive service: a quotation in under one hour, a technical solution within 24 hours, and a product demo to prove performance. During production, we strictly follow the contract, provide regular progress updates, and ship on time. After delivery, we offer a 12-month warranty, overseas training, authorized calibration (optional), rental services, and regular return visits. Need a custom solution? Our R&D and QC teams are ready to work with you. All of this is delivered at a competitive price-because we believe long-term trust matters more than short-term profit.

2
product-1112-741

 

FAQ

 

Q: What is a Transformer Capacity Load No Load Tester used for?

A: It is used to measure the rated capacity, no-load loss (iron loss), no-load current, load loss (copper loss), impedance voltage, and short-circuit impedance of distribution and power transformers without requiring external high-voltage power supplies.

Q: How does it perform no-load and load tests without a high-capacity power source?

A: The transformer capacity load no load tester uses a variable-frequency or low-power method. For no-load test, it applies a reduced voltage (as low as 30-50V) to the low-voltage side and measures losses, then calculates the rated no-load parameters mathematically. For load test, it injects a small current (1-10% of rated) and extrapolates to full load values.

Q: How accurate are the capacity and loss measurements?

A: High-quality testers offer accuracy of ±0.5% to ±1% for capacity, ±0.5% for losses, and ±0.2% for voltage/current measurements. This level of precision is sufficient for energy auditing, commissioning, and forensic investigation of transformer performance.

Q: Is the transformer capacity load no load tester portable for field use?

A: Yes, typical units weigh between 5kg to 15kg (including test leads) and are housed in rugged carrying cases. They are battery-powered or operate from a standard single-phase 220V/110V outlet, making them ideal for substation or warehouse use without lifting equipment.

Q: Can the goods be customized and how long is the delivery time?

A: After ordering the goods, we can use the latest technology to place orders according to the customer's special requirements. If there are no accidents, the delivery time is usually within 10 working days.

 

We are a professional transformer capacity load no load tester manufacturers in China.We can provide the best professional transformer capacity load no load tester for sales and competitive price. If you are looking for transformer capacity load no load tester supplier, we are a good choice.


Contact us to get transformer capacity load no load tester price.

 

Hot Tags: transformer capacity load no load tester, China transformer capacity load no load tester manufacturers, suppliers, factory, Portable Ground Resistance & Resistivity Tester

Send Inquiry

whatsapp

Phone

E-mail

Inquiry

Bag