AC RESONANT TEST SYSTEM FOR ON-SITE TESTING OF EXTRUDED HV CABLES

Jul 15, 2025 Leave a message

1. Working Principle: Series Resonance

In a series resonant circuit, the inductive reactance (XL) of a high-voltage reactor and the capacitive reactance (XC) of the cable under test cancel each other:

info-222-54

Solving for frequency:

info-129-67

At resonance:

The test voltage is maximized across the cable with minimal power input.

The system acts like a voltage magnifier.

Reactive power is circulated, only small active power is drawn from the supply.

 

2. Key System Components (Detailed)

Component Function Key Notes
Variable Frequency Power Supply (VFPS) Supplies power at tuned frequency (20–300 Hz) Often solid-state inverter; precise control of output frequency
Excitation Transformer Steps up low voltage from VFPS Insulation must withstand HV side output
HV Reactor (Inductor) Forms LC resonance with test object Must be variable or modular to handle different capacitances
Test Object (Cable) Provides the test capacitance Long cables = high capacitance, typically 0.1–5 µF
HV Divider Measures output voltage accurately Capacitive or resistive divider; calibrated
Control & Protection System Monitors operation, logs data, trips on fault Includes overvoltage, overcurrent, PD threshold alarms

 

3. System Configurations

A. Modular Containerized System

Mounted in truck or container

Used for field testing of long-distance HV power lines (e.g. 220kV, 400kV)

Can test 1–10 km cables

 

B. Mobile Skid-Based System

Compact for medium-voltage applications

Easily transported via trailer or pickup

Lower output: 50–150 kV

 

4. Typical Testing Process

Step Description
1. Preparation Measure cable length, capacitance, check termination, ground shield
2. Resonance Tuning Adjust frequency until maximum voltage appears across the cable
3. Voltage Ramp-Up Increase voltage to test level (usually 1.7–2.0× U₀ of cable)
4. Soak Period Maintain full test voltage for 15–60 minutes
5. Monitoring Monitor voltage, current, PD (optional), temperature
6. Discharge Properly discharge the cable before ending test

 

5. System Sizing Guidelines

To select the correct system, calculate the load capacitance and test requirements:

A. Cable Capacitance Estimation:

info-421-41

 

B. Required Test Power:

info-129-38

V: Test voltage (rms)

f: Frequency (Hz)

C: Total capacitance (µF)

Q: Reactive power (kVA)

 

C. Example:

Cable: 5 km, XLPE, 220kV class

Capacitance: 0.25 µF/km × 5 = 1.25 µF

Test voltage: 1.7 × √2 × 127 kV ≈ 305 kV (peak)

Frequency: 50 Hz

Q=2π×50×(305×103)2×1.25×10−6≈36MVARQ = 2\pi × 50 × (305 × 10^3)^2 × 1.25 × 10^{-6} ≈ 36 MVARQ=2π×50×(305×103)2×1.25×10−6≈36MVAR

The resonant system must support this reactive power at the desired voltage.

 

6. Advanced Options

Integrated Partial Discharge (PD) Analysis
Detect early insulation defects

Tan δ (Dissipation Factor) Measurement

Insulation aging analysis

Remote Control & SCADA Integration
For automated testing, record keeping, and cloud reporting

HV Filter (Harmonic Suppression)
Prevent EMI disturbances during resonant tuning

 

7. Standards and Pass Criteria

Standard Voltage Level Test Duration Pass Criteria
IEC 60840 30–150kV 1h at 2× U₀ No breakdown
IEC 62067 150–500kV 1h at 2× U₀ No breakdown
IEEE 400.4 All Typically 30–60 min Optional PD < 5 pC

 

8. Applications

Factory Acceptance Testing (FAT) & Site Acceptance Testing (SAT)

Commissioning of long underground power transmission lines

HVDC cable sheath testing (at AC)

Submarine cable verification

Cross-bonded cable circuit section testing

 

9. Comparison: AC Resonant vs Other Methods

Feature AC Resonant AC Test Transformer VLF Test DC Test
Suitable for long cables ✅ ❌ (too bulky) ✅ ❌ (damaging for XLPE)
Power required Low (resonant) High Very low Low
PD Measurement ✅ ✅ Limited ❌
Weight/Portability Medium High Light Light
Use on XLPE cable ✅ ✅ ✅ ❌